Proven Results
Project Portfolio
Delivering critical infrastructure maintenance across Ireland. See how we solve complex challenges.

Hydrodemolition
Hydrodemolition of M50 Bridge Deck
Dublin, Ireland
The client required the removal of 50mm of deteriorated concrete from a bridge deck without damaging the reinforcement or causing vibration damage to the structure. The project had to be completed within a strict 48-hour window to minimize traffic disruption.

Industrial Coatings
Chemical Tank Lining Replacement
Cork, Ireland
Existing linings in six chemical storage tanks had failed, posing a risk of containment breach. The facility was live, requiring strict safety protocols and zero solvent emissions.

Hydrodemolition
Bridge Column Hydrodemolition Upgrade
Limerick, Ireland
Bridge support columns had deteriorated concrete around reinforcement cages. Work required night possessions, zero vibration impact, and strict water and debris control.